A hypothetical plan, tested with a ridership model
By 2100, people could live in Dallas–Fort Worth.
Today almost all of them would have to drive to get anywhere. This is the case for a regional transit network built at a steady a year, what it would change, and what it wouldn't.
About 8 minutes · every number links to its source or to the model
1 · The roads we already pay for
One way to get around, and a steep price for it
2 · Investing for real
What a steady budget builds in 75 years
3 · What it means near you
Your station, and how much your neighborhood changes
Where it is
4 · Connections
Links and what they unlock
5 · 2100
Two futures for the same region
Current track
Today's lines and service, the region grown to 2100 around them
The proposal
The 2 million riders network, built at a flat budget
See it for yourself
Every line, station and opening year, a trip planner from any address, and the build-out year by year.
Open the map →Sources and notes
Model numbers come from this project's ridership model (block groups, census and LODES jobs data, calibrated to today's ~80,000 daily rail boardings; code and method). Long-range numbers are estimates: read them as orders of magnitude, and the comparisons more than the totals. Outside figures were gathered in October 2026 from the published summaries of the pages cited below; check the originals before quoting them.